Cedar River Stormwater Outfall
Project Value: $ 3,257,000
Project Status: Completed - January 2008
Client: City of Jacksonville
A/E: CDM Inc.
This project involved the excavation of a 265,000 CY storm retention pond which included heavy clearing and grubbing, storm structures and piping, articulating concrete matting system, concrete retaining and weir wall, grassing, fencing, guardrail and signage.
Jones Ave. Stormwater Improvements
Project Value: $ 3,878,000
Project Status: Completed - November 2007
Client: Orange County
A/E: DRMP
This project included the excavation of approximately 165,000 CY of material from the stormwater pond and roadside canals. The canal excavation included the removal of over 40,000 CY of unsuitable material (muck). The drainage system for the project included over 2,900 lf of RCP and several structures.