Chickasaw photo

Chickasaw Trail/Lake Underhill Intersection


Chickasaw/Lk. Underhill Photo Gallery

  • Project Value: $ 2,397,800
  • Project Status: Completed - December 2007
  • Client: Orange County
  • A/E: CPH Engineers
This project included ½ mile of road widening from two lanes to four lanes including underground utilities, curb and sidewalk, signage and landscaping. A new signalization system from the intersection was also included. The project’s MOT plan was challenging due to the shear volume of traffic.



Collins Rd. Photo

Collins Rd. Intersection


Collins Rd. Photo Gallery

  • Project Value: $ 4,185,000
  • Project Status: Completed – July 2006
  • Client: City of Jacksonville & JEA
  • A/E: Ayers Associates
This project included ½ mile of road widening from two lanes to four lanes and re-construction of a major intersection including underground utilities, concrete pavement, curb and sidewalk, drainage structures and pipe, fencing, gravity wall, street lighting, signalization, signage, relocation of overhead transmission lines and a 43,000 cy retention pond.




SL-TL May05

Sand Lake Rd. & Turkey Lake Rd. Intersection


Sand Lake/Turkey Lake Photo Gallery

  • Project Value: $ 2,339,174.00
  • Project Status: Completed – April 2009
  • Client: EDEN SPRINGS DEVELOPER, LLC, fka EB AT COLONY LAKES, LLC
  • A/E: HDR Engineering
This project included the intersection widening of Sand Lake Rd. & Turkey Lake Rd. in Orlando, Fl. The intersection was widened in all directions to handle the increase in traffic to the surrounding Retail Shopping Centers in the vicinity to this intersection. The project included the widening of a major intersection including underground utility installation/relocation, concrete pavement, curb and sidewalk, concrete retaining wall, drainage structures and pipe, street lighting, signalization, signage and relocating all overhead public utility lines to below ground.



SRA1A 002

SR A1A & Mickler Rd. Intersection


SR A1A & Mickler Rd. Photo Gallery

  • Project Value: $ 2,185,000.00
  • Project Status: Completed – March 2009
  • Client: FDOT District Two
  • A/E: Comprehensive Engineering Services, Inc. (CES)
Project consisted of ½ mile of road widening from two lanes to three lanes, intersection concrete medians, signalized intersection w/ monotube assembly, three detention ponds, storm drainage system, gravity wall w/ pedestrian pickett railing, sidewalk and signage.