Storm-Utilities Projects

Cedar River Stormwater Outfall

  • Project Value: $ 3,257,000
  • Project Status: Completed January 2008
  • Client: City of Jacksonville
  • A/E: CDM Inc.

This project involved the excavation of a 265,000 CY storm retention pond which included heavy clearing and grubbing, storm structures and piping, articulating concrete matting system, concrete retaining and weir wall, grassing, fencing, guardrail and signage.

Cedar River Photo Gallery

Stacks Image 1883
Stacks Image 1885
Stacks Image 1887
Stacks Image 1889
Stacks Image 1891

Jones Ave. Stormwater Improvements

  • Project Value: $ 3,878,000
  • Project Status: Completed November 2007
  • Client: Orange County
  • A/E: DRMP

This project included the excavation of approximately 165,000 CY of material from the stormwater pond and roadside canals. The canal excavation included the removal of over 40,000 CY of unsuitable material (muck). The drainage system for the project included over 2,900 lf of RCP and several structures.

Jones Ave. Photo Gallery

Stacks Image 1893
Stacks Image 1895
Stacks Image 1897
Stacks Image 1899
Stacks Image 1901
Stacks Image 219
Gibbs & Register, Inc.
232 South Dillard Street
Winter Garden, Florida 34787
Office: 407-654-6133
Facsimile: 407-654-6134
Stacks Image 2289